BUS 515 Week 11 Discussion Questions

BUS 515 Week 11 Discussion Questions – Strayer

Click On The Link Below to Purchase:

http://www.hwmojo.com/products/bus-515-week-11-discussions

 

Week 11 DQ 1
“Operations Management” Please respond to the following:
• Explain how this course has impacted your knowledge in operations management, and then determine which areas significantly affected your understanding on how operations strategy supports the business strategy.

Week 11 DQ 2
“Operations Manager” Please respond to the following:
• Explain three challenges that are present in an operations manager’s role, and then determine key methods in which you would mitigate those challenges. Provide specific examples to support your rationale.

BUS 515 Week 11 Discussion Questions – Strayer NEW

BUS/515 Week 11 Discussion Questions – Strayer NEW

Click On The Link Below to Purchase A+ Graded Material
Instant Download

http://budapp.net/BUS-515-Week-11-Discussion-Questions-Strayer-NEW-BUS515W11D.htm

 

Week 11 DQ 1
“Operations Management” Please respond to the following:
• Explain how this course has impacted your knowledge in operations management, and then determine which areas significantly affected your understanding on how operations strategy supports the business strategy.

Week 11 DQ 2
“Operations Manager” Please respond to the following:
• Explain three challenges that are present in an operations manager’s role, and then determine key methods in which you would mitigate those challenges. Provide specific examples to support your rationale.

BUS 515 Week 9 Discussion Questions – Strayer University NEW

BUS/515 Week 9 Discussion Questions – Strayer NEW

Click On The Link Below to Purchase A+ Graded Material
Instant Download

http://budapp.net/BUS-515-Week-9-Discussion-Questions-Strayer-NEW-BUS515W9D.htm

 

Week 9 DQ 1
“Inventory Management” Please respond to the following:
• Analyze the purpose of inventory management as it applies to operations management, and then evaluate the advantages and disadvantages evident in the use of the ABC classification system.
• Suggest a situation in which safety stock must be utilized, and then determine how the organization should decide on the reorder point when using this methodology.

Week 9 DQ 2
“Aggregate Planning” Please respond to the following:
• Illustrate, using one example, a situation that utilizes aggregate planning, and then determine which level (chase or hybrid) should be used by the organization in the situation you have illustrated. Provide specific examples to support your rationale.
• Compare and contrast two or three aggregate plans for companies with tangible products against aggregate plans for companies with nontangible products. Provide specific examples to support your rationale.

BUS 515 Week 9 Assignment 3 – Strayer University New

BUS/515 Week 9 Assignment 3 – Strayer
Click On The Link Below To Purchase A+ Graded Material
Instant Download

http://budapp.net/BUS-515-Week-9-Assignment-3-Strayer-NEW-BUS515A3.htm

 

Assignment 3: Vice President of Operations, Part 3
Due Week 9 and worth 320 points
Using the same scenario from Assignment 1, present the following findings to your Chief Executive Officer.
Create a presentation in a common format (PowerPoint or a similar program) with a minimum of twenty (20) slides and corresponding speaker notes in which you:
1. Determine which statistical technique you will employ to measure the quality characteristics of your organization. Provide examples to support the rationale.
2. Analyze the current facility location, and then use the three-step procedure to determine a new location.
3. Analyze the key concepts related to capacity planning and facility location for the new location.
4. Examine the current work system design, and determine your organization’s selected feasibility in the job design (i.e., technical, economic, behavioral). Assess key elements of the rationale in the work design competitive advantage.
5. Using the method analysis described in the textbook, defend the new change implementation process and the rationale for the change of method.
6. Develop a diagram showing network planning techniques, in which you use the program evaluation and review technique (PERT) and the critical path method (CPM).
7. Use at least three (3) quality academic resources in this assignment. Note: Wikipedia and other Websites do not quality as academic resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
Include corresponding speaker notes for each slide included in the presentation.

BUS 515 Week 8 Discussion Questions – Strayer University NEW

BUS/515 Week 8 Discussion Questions – Strayer NEW

Click On The Link Below to Purchase A+ Graded Material
Instant Download

http://budapp.net/BUS-515-Week-8-Discussion-Questions-Strayer-NEW-BUS515W8D.htm

 

Week 8 DQ 1
“Work System Design” Please respond to the following:
• Describe one of the worst jobs you believe you have encountered, and speculate on why people are still attracted to this job. Create a redesign plan for this job which focuses on improved productivity.
• Evaluate a compensation system of your choice in terms of how the compensation reinforces the behaviors needed to meet the company’s objective. Next, propose three improvements to the compensation system based on your evaluation.

Week 8 DQ 2
“Project Management” Please respond to the following:
• Using the four steps in network planning techniques, select a personal project that you have recently completed or are in the process of completing. Determine three to five challenges that could affect the estimated completion time.
• Defend the determination of crashing a non-critical activity in your personal project network. Provide specific examples to support your rationale.

BUS 515 Week 3 Homework Problems – Strayer University New

BUS/515 Problems Chapter 4 Week 3 – Perfect Solution
Click on the link (blue) below to purchase solutions

http://www.hwmojo.com/products/bus515-problems-chapter-4

We can help with many Strayer classes, email us if you need help with your problems, quizzes, assignments, case studies and discussions. support@hwmojo.com

BUS 515 Week 3 Chapter 4 Problems
2. Gabriela Manufacturing was able to find a new supplier
that would provide the item for $1.80 per unit with an annual
fixed cost of $200,000. Should Gabriela Manufacturing insource
or outsource the item?
4. Fast Finish, Inc. (FFI) has made a technological breakthrough
in snow board finish application. FFI will apply the finish for $0.23
per unit in variable costs plus a fixed annual cost of $230,000. Use
the cost and demand information given in Problem 3 for Downhill
Boards to evaluate this proposal.
(a) What will it cost Downhill Boards to outsource the finishing
process?
(b) At what demand level does it make sense economically to
outsource the finishing process?
(c) What additional factors should be considered when making
this outsourcing decision?
6. Cal’s Carpentry is considering outsourcing its accounts receivable
function. Currently, Cal employs two full-time clerks
and one part-time clerk to manage accounts receivable. Each
full-time clerk has an annual salary of $36,000 plus fringe benefits
costing 30 percent of their salary. The part-time clerk makes
$18,000 per year but has no fringe benefits. Total salary plus
fringe cost is $111,600. Cal estimates that each account receivable
incurs a $10 variable cost. The Small Business Accounts Receivables
Group (SBARG) specializes in handling accounts
receivable for small- to medium-size companies. Doris Roberts
from SBARG has offered to do the accounts receivable for Cal’s
Carpentry at a fixed cost of $75,000 per year plus $30 per account
receivable. Next year, Cal expects to have 2000 accounts
receivable.
(a) Calculate the cost for Cal’s Carpentry to continue doing
accounts receivable in-house.
(b) Calculate the cost for Cal’s Carpentry to use SBARG to
handle the accounts receivable.
(c) If the fixed annual cost offered by SBARG is nonnegotiable
but it is willing to negotiate the variable cost, what
variable cost from SBARG would make Cal indifferent to
the two options?
(d) What other alternatives might Cal consider in terms of
his current staffing for accounts receivable?
(e) What additional criteria should Cal consider before outsourcing
the accounts receivable?

BUS 515 Homework Problems – Strayer University New

BUS/515 Homework Problem Solved (all weeks) – A Graded
Follow the link below (link in blue to hwmojo.com) to purchase A Graded Solutions

http://www.hwmojo.com/products/bus-515-problems

We can also hep with BUS 515 Assignments and Exams. Visit www.hwmojo.com or email us support@hwmojo.com

BUS 515 Operations Management Homework Problems Solution
BUS 515 Week 2 Problems Chapter 2 & 3
Chapter 2: Problems 2,4,6,8
2. Last week a painter painted three houses in five days. This
week she painted two houses in four days. In which week was
the painter more productive?
4. A company that makes kitchen chairs wants to compare
productivity at two of its facilities. At facility #1, six workers produced
240 chairs. At facility #2, four workers produced 210 chairs
during the same time period.Which facility was more productive?
6. Aztec Furnishings makes hand-crafted furniture for sale in
its retail stores. The furniture maker has recently installed a new
assembly process, including a new sander and polisher.With this
new system, production has increased to 90 pieces of furniture
per day from the previous 60 pieces of furniture per day. The
number of defective items produced has dropped from 10 pieces
per day to 1 per day. The production facility operates strictly
eight hours per day. Evaluate the change in productivity for
Aztec using the new assembly process.
8. Med-Tech labs is a facility that provides medical tests and
evaluations for patients, ranging from analyzing blood samples
to performing magnetic resonance imaging (MRI). Average cost
to patients is $60 per patient. Labor costs average $15 per patient,
materials costs are $20 per patient, and overhead costs are
averaged at $20 per patient.
(a) What is the multifactor productivity ratio for Med-Tech?
What does your finding mean?
(b) If the average lab worker spends three hours for each patient,
what is the labor productivity ratio?

Chapter 3: Problems 2, 8, 10, 12, 14, 16, 18

2. Med-First is a medical facility that offers outpatient medical
services. The facility is considering offering an additional
service, mammography screening tests, on-site. The facility
estimates the annual fixed cost of the equipment and skills necessary
for the service to be $120,000. Variable costs for each patient
processed are estimated at $35 per patient. If the clinic plans to
charge $55 for each screening test, how many patients must it
process a year in order to break even?
8. George Fine, owner of Fine Manufacturing, is considering
the introduction of a new product line. George has considered
factors such as costs of raw materials, new equipment, and requirements
of a new production process. He estimates that the
variable costs of each unit produced would be $8 and fixed costs
would be $70,000.
(a) If the selling price is set at $20 each, how many units have
to be produced and sold for Fine Manufacturing to break
even? Use both graphical and algebraic approaches.
(b) If the selling price of the product is set at $18 per unit,
Fine Manufacturing expects to sell 15,000 units. What
would be the total contribution to profit from this product
at this price?
(c) Fine Manufacturing estimates that if it offers the product
at the original target price of $20 per unit, the companywill sell about 12,000 units.Which pricing strategy—$18
per unit or $20 per unit—will yield a higher contribution
to profit?
(d) Identify additional factors that George Fine should consider
in deciding whether to produce and sell the new product.
10. Easy-Tech Software Corporation is evaluating the production
of a new software product to compete with the popular word
processing software currently available. Annual fixed costs of producing
the item are estimated at $150,000, and the variable cost is
$10 per unit. The current selling price of the item is $35 per unit,
and the annual sales volume is estimated at 50,000 units.
(a) Easy-Tech is considering adding new equipment that
would improve software quality. The negative aspect of
this new equipment would be an increase in both fixed
and variable costs. Annual fixed costs would increase by
$50,000 and variable costs by $3. However, marketing expects
the better-quality product to increase demand to
70,000 units. Should Easy-Tech purchase this new equipment
and keep the price of their product the same? Explain
your reasoning.
(b) Another option being considered by Easy-Tech is the increase
in the selling price to $40 per unit to offset the additional
equipment costs. However, this increase would
result in a decrease in demand to 40,000 units. Should
Easy-Tech increase its selling price if it purchases the new
equipment? Explain your reasoning.
12. Mop and Broom Manufacturing is evaluating whether to
produce a new type of mop. The company is considering the operations
requirements for the mop as well as the market potential.
Estimates of fixed costs per year are $40,000, and the variable
cost for each mop produced is $20.
(a) If the company sells the product at a price of $25, how
many units of product have to be sold in order to break
even? Use both the algebraic and graphical approaches.
(b) If the company sells 10,000 mops at the product price of
$25, what will be the contribution to profit?
14. Jacob’s Baby Food Company must go through the following
steps to make mashed carrots: (1) unload carrots from truck;
(2) inspect carrots; (3) weigh carrots; (4) move to storage; (5) wait
until needed; (6) move to washer; (7) boil in water; (8) mash
carrots; (9) inspect. Draw a process flow diagram for these steps.
16. Oakwood Outpatient Clinic is analyzing its operation in
an effort to improve performance. The clinic estimates that a patient
spends on average hours at the facility. The amount of
time the patient is in contact with staff (i.e., physicians, nurses,
office staff, lab technicians) is estimated at 40 minutes. On average
the facility sees 42 patients per day. Their standard has been
40 patients per day. Determine process velocity and efficiency for
the clinic.
18. Mop and Broom Manufacturing estimates that it takes
hours for each broom to be produced, from raw materials to final
product. An evaluation of the process reveals that the amount of
time spent working on the product is 3 hours. Determine process
velocity.
BUS 515 Week 3 Chapter 4 Problems
2. Gabriela Manufacturing was able to find a new supplier
that would provide the item for $1.80 per unit with an annual
fixed cost of $200,000. Should Gabriela Manufacturing insource
or outsource the item?
4. Fast Finish, Inc. (FFI) has made a technological breakthrough
in snow board finish application. FFI will apply the finish for $0.23
per unit in variable costs plus a fixed annual cost of $230,000. Use
the cost and demand information given in Problem 3 for Downhill
Boards to evaluate this proposal.
(a) What will it cost Downhill Boards to outsource the finishing
process?
(b) At what demand level does it make sense economically to
outsource the finishing process?
(c) What additional factors should be considered when making
this outsourcing decision?
6. Cal’s Carpentry is considering outsourcing its accounts receivable
function. Currently, Cal employs two full-time clerks
and one part-time clerk to manage accounts receivable. Each
full-time clerk has an annual salary of $36,000 plus fringe benefits
costing 30 percent of their salary. The part-time clerk makes
$18,000 per year but has no fringe benefits. Total salary plus
fringe cost is $111,600. Cal estimates that each account receivable
incurs a $10 variable cost. The Small Business Accounts Receivables
Group (SBARG) specializes in handling accounts
receivable for small- to medium-size companies. Doris Roberts
from SBARG has offered to do the accounts receivable for Cal’s
Carpentry at a fixed cost of $75,000 per year plus $30 per account
receivable. Next year, Cal expects to have 2000 accounts
receivable.
(a) Calculate the cost for Cal’s Carpentry to continue doing
accounts receivable in-house.
(b) Calculate the cost for Cal’s Carpentry to use SBARG to
handle the accounts receivable.
(c) If the fixed annual cost offered by SBARG is nonnegotiable
but it is willing to negotiate the variable cost, what
variable cost from SBARG would make Cal indifferent to
the two options?
(d) What other alternatives might Cal consider in terms of
his current staffing for accounts receivable?
(e) What additional criteria should Cal consider before outsourcing
the accounts receivable?
BUS 515 Week 4 Problems Chapter 5
2. A jet engine has 10 components in series. The average reliability
of each component is 0.998.What is the reliability of the engine?
4. An engine system consists of three main components in a
series, all having the same reliability. Determine the level of reliability
required for each of the components if the engine is to have
a reliability of 0.998.
6. What would be the reliability of the bank system above if
each of the three components had a backup with a reliability of
0.80? How would the total reliability be different?
8. A university Web server has five main components, each
with the same reliability. All five components must work for the
server to function as intended. If the university wants to have a
95 percent reliability, what must be the reliability of each of the
components?
10. The following system of components has been proposed
for a new product. Determine the reliability of the system.
R _ 0.85 R _ 0.90
R _ 0.90 R _ 0.85 R _ 0.90 R _ 0.95
BUS 515 Week 5 Problems Chapter 7 & 8
Chapter 7
2. A manufacturer of thermostats uses a kanban system to
control the flow of materials. The packaging center processes 10
thermostats an hour and receives completed thermostats every
30 minutes. Containers hold 5 thermostats each.
(a) How many kanbans are needed for the packaging center?
(b) If management decides to keep two thermostats as safety
stock, how many kanbans will be needed?
4. Carlos Gonzales is production manager at an assembly plant
that manufactures cordless telephones. The company is planning
to install a pull system. The process is being planned to have a
usage rate of 50 pieces per hour. Each container is designed to
hold 10 pieces. It takes an average of 30 minutes to complete a
cycle.
(a) How many containers will be needed?
(b) How will the number of needed containers change as the
system improves?
6. Anna works on an assembly line where it takes her 30
minutes to produce 20 units of a product needed to fill a container.
It takes her an additional 5 minutes to transport the container
to Josh, who works at the next station. The company uses a
safety stock of 20 percent. The current assembly line uses five
kanbans between Anna’s and Josh’s stations. Compute the demand
for the product.
8. Consider the information from Problem 7. Determine how
the number of kanbans and the inventory level will be affected if
the time required for Robert to receive the material increases to
30 minutes.
Chapter 8
6. The manager of the health clinic in Problem 5 would also
like to use exponential smoothing to forecast demand for emergency
services in the facility. As in Problem 5, she is not sure
whether to use a high or low value of _. To make her decision,
she would like to compare the forecast accuracy of a high and low
_ on historical data. Again, she has decided to use an _ _ 0.7 for
the high value and _ _ 0.1 for the low value.
(a) Given the following historical data, which value of _ do
you think would be better to use?
(b) Is your answer the same as in Problem 5? Why or why
not?
8. A manufacturer of printed circuit boards uses exponential
smoothing with trend to forecast monthly demand of its product.
At the end of December, the company wishes to forecast sales
for January. The estimate of trend through November has been
200 additional boards sold per month. Average sales have been
around 1000 units per month. The demand for December was
1100 units. The company uses _ _ 0.20 and _ _ 0.10. Make a
forecast including trend for the month of January.
10. Rosa’s Italian restaurant wants to develop forecasts of
daily demand for the next week. The restaurant is closed on
Mondays and experiences a seasonal pattern for the other six
days of the week. Mario, the manager, has collected information
on the number of customers served each day for the past two
weeks. If Mario expects total demand for next week to be
around 350, what is the forecast for each day of next week?
12. The number of students enrolled at Spring Valley Elementary
has been steadily increasing over the past five years. The
school board would like to forecast enrollment for years 6 and 7
in order to better plan capacity. Use a linear trend line to forecast
enrollment for years 6 and 7.
16. A company uses exponential smoothing with trend to
forecast monthly sales of its product, which show a trend pattern.
At the end of week 5, the company wants to forecast sales for
week 6. The trend through week 4 has been 20 additional cases
sold per week. Average sales have been 85 cases per week. The demand
for week 5 was 90 cases. The company uses _ _ 0.20 and
_ _ 0.10.Make a forecast including trend for week 6.
20. A company has used three different methods to forecast
sales for the past five months. Use MAD and MSE to evaluate the
performance of the three methods.
(a) Which forecasting method performed best? Do MAD
and MSE give the same results?
(b) Which of these is actually the naïve method?

BUS 515 Week 6 Problems Chapter 6

4. A production manager at Ultra Clean Dishwashing Company
is monitoring the quality of the company’s production
process. There has been concern relative to the quality of the
operation in accurately filling the 16 ounces of dishwashing liquid.
The product is designed for a fill level of 16.00 _ 0.30. The
company collected the following sample data on the production
process:
(a) Are the process mean and range in statistical control?
(b) Do you think this process is capable of meeting the design
standard?
6. The Awake Coffee Company produces gourmet instant coffee.
The company wants to be sure that the average fill of coffee
containers is 12.0 ounces. To make sure the process is in control,
a worker periodically selects at random a box of six containers of
coffee and measures their weight.When the process is in control,
the range of the weight of coffee samples averages 0.6 ounces.
(a) Develop an R-chart and an chart for this process.
(b) The measurements of weight from the last five samples
taken of the six containers follow:
Is the process in control? Explain your answer.
8. A tire manufacturer has been concerned about the number
of defective tires found recently. In order to evaluate the true
magnitude of the problem, a production manager selected 10
random samples of 20 units each for inspection. The number of
defective tires found in each sample are as follows:
x-
(a) Develop a p-chart with a z _ 3.
(b) Suppose that the next four samples selected had 6, 3, 3,
and 4 defects.What conclusion can you make?
10. University Hospital has been concerned with the number
of errors found in its billing statements to patients. An audit of
100 bills per week over the past 12 weeks revealed the following
number of errors:
(a) Develop control charts with z _ 3.
(b) Is the process in control?
14. Quality Style manufactures self-assembling furniture. To
reduce the cost of returned orders, the manager of its quality
control department inspects the final packages each day using
randomly selected samples. The defects include wrong parts,
missing connection parts, parts with apparent painting problems,
and parts with rough surfaces. The average defect rate is
three per day.
(a) Which type of control chart should be used? Construct a
control chart with 3-sigma control limits.
(b) Today the manager discovered nine defects. What does
this mean?
20. Breeze Toothpaste Company has been having a problem
with some of the tubes of toothpaste leaking. The tubes are
packed in containers with 100 tubes each. Ten containers of
toothpaste have been sampled. The following number of toothpaste
tubes were found to have leaks:
Develop a p-chart with 3-sigma control limits and evaluate
whether the process is in statistical control.
22. The Crunchy Potato Chip Company sells chips in boxes
with a net weight of 30 ounces per box (850 grams). Each box
contains ten individual 3-ounce packets of chips. Product design
specifications call for the packet-filling process average to be set
at 86.0 grams so that the average net weight per box will be 860
grams. Specification width is set for the box to weigh 850 _ 12
grams. The standard deviation of the packet-filling process is 8.0
grams per box. The target process capability ratio is 1:33. The
production manager has just learned that the packet-filling
process average weight has dropped down to 85.0 grams. Is the
packaging process capable? Is an adjustment needed?

BUS 515 Week 7 Problems Chapter 9 And 10
Chapter 9
2. A manufacturer of printed circuit boards has a design capacity
of 1000 boards per day. The effective capacity, however, is
700 boards per day. Recently, the production facility has been
producing 950 boards per day. Compute the design and effective
capacity utilization measures.What do they tell you?
8. The owners of Sweet-Tooth Bakery have determined that
they need to expand their facility in order to meet their increased
demand for baked goods. The decision is whether to expand now
with a large facility or expand small with the possibility of having
to expand again in five years.
The owners have estimated the following chances for demand:
• The likelihood of demand being high is 0.70.
• The likelihood of demand being low is 0.30.
Profits for each alternative have been estimated as follows:
• Large expansion has an estimated profitability of either
$80,000 or $50,000, depending on whether demand turns
out to be high or low.
• Small expansion has a profitability of $40,000, assuming demand
is low.
• Small expansion with an occurrence of high demand would
require considering whether to expand further. If the bakery
expands at this point, the profitability is to be $50,000.
(a) Draw a decision tree showing the decisions, chance
events, and their probabilities, as well as the profitability
of outcomes.
(b) Solve the decision tree and decide what the bakery
should do.
10. Spectrum Hair Salon is considering expanding its business,
as it is experiencing a large growth. The question is whether
it should expand with a bigger facility than needed, hoping that
demand will catch up, or with a small facility, knowing that it will
need to reconsider expanding in three years.
The management at Spectrum has estimated the following
chances for demand:
• The likelihood of demand being high is 0.70.
• The likelihood of demand being low is 0.30.
Estimated profits for each alternative are as follows:
• Large expansion has an estimated profitability of either
$100,000 or $70,000, depending on whether demand turns
out to be high or low.
• Small expansion has a profitability of $50,000, assuming
that demand is low.
• Small expansion with an occurrence of high demand would
require considering whether to expand further. If the business
expands at this point, the profitability is expected to be
$90,000. If it does not expand further, the profitability is expected
to be $60,000.
Draw a decision tree and solve the problem. What should
Spectrum do?
12. The owners of Speedy Logistics, a company that provides
overnight delivery of documents, are considering where
to locate their new facility in the Midwest. They have narrowed
their search down to two locations and have decided to use factor
rating to make their decision. They have listed the factors
they consider important and assigned a factor score to each location
based on a five-point scale. The information is shown
here. Using the procedure for factor rating, decide on the better
location.
14. The Bakers Dozen Restaurant is considering opening a
new location. It has considered many factors and identified the
ones that are most important. Two locations are being evaluated
based on these factors, using factor rating. Each location has been
evaluated relative to the factors on a five-point scale. These numbers
are shown here. Use factor rating to help the restaurant decide
on the better location.
16. Given here are the coordinates for each of the four towns
to be serviced by the warehouse in Problem 15. Use the information
from Problem 15 and the center of gravity method to determine
coordinates for the warehouse.
18. The Quick Copy center for document copying is deciding
where to locate a new facility. The annual fixed and variable
costs for each site it is considering have been estimated as
follows:
If demand is expected to be 3000 units, which location is best?
Chapter 10
2. Use trial and error to find a better layout for Fresh Foods
Grocery in Problem 1. Compute the ld score and compare it to
the ld scores computed for Fresh Foods’ current and proposed
layouts.Which is best?
6. Use trial and error to develop a better layout for Gator Office
Supplies. Which departments do you think need to be in
close proximity to one another?
8. David’s Sport Supplies is a store that sells sports equipment
and gear for teenagers and young adults. David’s is in the process
of assigning the location of storage areas in its warehouse (Figure
10-16) to minimize the number of trips made to retrieve needed
items. Given here in Table 10-14 are the departments that need to
be located, the number of trips made per week for each department,
and the area needed by each department.
10.Michael Marc, the President of MMS Associates, is considering
an alternative plan for the sales staff situation described in
Problem 9. His alternative plan is shown in Figure 10-18.What is
the ld score for this plan? How does it compare to the original
plan considered in Problem 9?
12. A manufacturing company is designing an assembly line
to produce its main product. The line should be able to produce
60 units per hour. The following data in Table 10-16 give
the necessary information.
(a) Which task is the bottleneck?
(b) Draw a precedence diagram for the above information.
(c) Compute the cycle time with a desired output of 60 units
per hour.
18. A dress-making operation is being designed as an assembly
line. Table 10-22 shows the tasks that need to be performed, their
task times, and preceding tasks. If the goal is to produce 30 dresses
per hour, answer the questions that follow the table.
(a) Compute the cycle time.
(b) Which task is the bottleneck?
(c) What is the maximum output for this line?
(d) Compute the theoretical minimum number of stations.
(e) Assign work elements to stations, using the longest task
time rule.
(f) Compute the efficiency and balance delay of your
assignment.
20. Use the data from Problem 19 to rebalance the line with a
cycle time of 90 seconds. How does the number of workstations
change? What happens to the output and the line’s efficiency?

BUS 515 Week 8 Problems Chapter 11 And 16
Chapter 11
2. Using the information in Problem 1, determine the sample
size needed if the standard time estimate is to be within 5 percent
of the true mean 99 percent of the time.
4. Using the information in Problem 3, calculate the sample
size needed if the standard time estimate is to be within 5 percent
of the true mean 99 percent of the time. Calculate the percentage
increase in sample size for the higher precision.
Use the following information from the Arkade Company for
Problems 5–10.
12. Frank’s Fabricators has collected the following information
to develop a standard time for producing their high-volume
Navigator III, a universal remote control. All of the times are in
minutes.
(a) Calculate the mean observed time for each element.
(b) Calculate the normal time for each element.
(c) Using an allowance factor of 15 percent of job time, calculate
the standard time for each element.
(d) Calculate the standard time for completing one Navigator
III.
(e) If an employee is able to produce at a rate equal to the
standard (100 percent efficiency), how many units should
she produce each hour?
(f) If an employee is working at 90 percent efficiency, how
many units should she complete in one hour?
(g) If a process improvement has changed the mean observed
time for element 6 to 1.50 minutes, what is the
new standard time for the Navigator III?
(h) If the company builds 20,000 Navigator IIIs each month,
how much less time does it require using the new
process?
14. You have 25 observations of university policeman Sgt.
Jack B. Nimble during his normal workday. The results are
shown here. Assume that the estimated proportion is to be
within 5 percent of the true proportion 95 percent of the time.
(a) Based on your preliminary observations, how many total
observations do you need to estimate the proportion of
time Sgt. Nimble spends doing paperwork?
(b) How many total observations do you need to estimate the
proportion of time Sgt. Nimble spends on the phone?
(c) How many total observations do you need to estimate the
proportion of time Sgt. Nimble seems to be unavailable?
16. As a class project you have been asked to project the proportion
of time a professor spends on various activities. You have
decided to use the work-sampling method. Your initial observations
are shown.
You are instructed that your estimates are to be within 5 percent
of the true value with 97 percent confidence (z _ 2.17).
(a) Based on your initial observations, how many total observations
are needed to estimate the proportion of time
the professor spends on each activity?
After taking additional observations, the following data are
available.
(b) Determine what proportion of time the professor spends
teaching class.
(c) Determine what proportion of time the professor spends
working on research.
(d) If the professor works approximately 54 hours per week,
determine the amount of time that would normally be
spent on each activity.

Chapter 16

Use the following project information for Problems 1 and 2.
1. Construct a network diagram using AON notation.
2. Using the network diagram constructed in Problem 1,
(a) Calculate the completion time for the project.
(b) Determine which activities are included on the critical
path.
6. Using the information given, calculate the variance for each
of the project activities.
8. Using your results from Problem 6,
(a) Calculate the probability that the project will be completed
in 38 weeks.
(b) Calculate the probability that the project will be completed
in 42 weeks.
10. Using the information given and the project completion
time calculated in Problem 9(a), reduce the completion time of
the project by 3 weeks in the most economical way.

14. Using the information given and expected project completion
time from Problem 13(c),
(a) Calculate the probability of completing the project in 36
weeks.
(b) Calculate the probability of completing the project in 40
weeks.
BUS 515 Week 9 Problems Chapter 12 & 13
Chapter 12 Problems
2. Yasuko’s Art Emporium (YAE) ships art from its studio located
in the Far East to its distribution center located on the West
Coast of the United States. YAE can send the art either via
transoceanic ship freight service (15 days transit) or by air freight
(2 days transit time). YAE ships 18,000 pieces of art annually.
(a) Calculate the average annual transportation inventory
when sending the art via transoceanic ship freight service.
(b) Calculate the average annual transportation inventory
when sending the art via air freight.
(c) What additional information is needed to compare the
two alternatives?
8. A technology problem has rendered some of the inventory
at FFF (Problem 6) obsolete. FFF estimates that the risk cost of its
inventory is now 10 percent.
(a) Calculate the new annual holding cost rate.
(b) Calculate the new total annual holding costs for FFF.
14. In an effort to reduce its inventory, Rapid Grower is offering
Greens, a local nursery (Problems 12 and 13), two additional
price breaks to consider. If the nursery orders a three-month supply,
the cost per bag is $16. If Greens orders a six-month supply,
the cost per bag is $14.50. Should Greens change its order quantity
calculated in Problem 13?
16. Sam’s Auto Shop services and repairs a particular brand of
foreign automobile. Sam uses oil filters throughout the year. The
shop operates 52 weeks per year, and weekly demand is 150 filters.
Sam estimates that it costs $20 to place an order and his annual
holding cost rate is $3 per oil filter. Currently, Sam orders in
quantities of 650 filters. Calculate the total annual costs associated
with Sam’s current ordering policy.
18. The local Office of Tourism sells souvenir calendars. Sue,
the head of the office, needs to order these calendars in advance
of the main tourist season. Based on past seasons, Sue has determined
the probability of selling different quantities of the calendars
for a particular tourist season.
The Office of Tourism sells the calendars for $12.95 each. The
calendars cost Sue $5 each. The salvage value is estimated to be
$0.50 per unsold calendar. Determine how many calendars Sue
should order to maximize expected profits.
Chapter 13 Problems
2. Jill has decided that the BackPack Company must have very
good customer service. She has asked you to develop a level aggregate
plan using inventories but not back orders. All demand
must be met each period. You must:
(a) Calculate the aggregate production rate.
(b) Calculate the appropriate workforce given the aggregate
production rate.
(c) Show what would happen if this plan were implemented.
(d) Calculate the costs of this plan.
(e) Evaluate the plan in terms of cost, customer service, operations,
and human resources.
4. Now that you have calculated the number of workers
needed each period in Problem 3, Jill wants to see how the plan
would actually work. You need to:
(a) Show what would happen if this plan were implemented.
(b) Calculate the costs associated with this plan.
(c) Evaluate the plan in terms of cost, customer service, operations,
and human resources.
6. Jill Nicholas believes there must be a better aggregate plan.
She has suggested a hybrid plan, using a permanent workforce of
195 employees and subcontracting as needed. Once again, Jill has
requested that you provide the following information:
(a) Calculate the regular-time production possible each period
given a workforce of 195.
(b) Show what would happen if this plan were implemented.
(c) Calculate the costs associated with this plan.
(d) Evaluate the plan in terms of cost, customer service, operations,
and human resources.
8. Calculate the size of the workforce needed for the company
to meet average weekly demand.
10. Develop a level aggregate plan for the Draper Company if
no back orders are permitted.
(a) Show what would happen if this plan were implemented.
(b) Calculate the costs associated with this plan.
(c) Evaluate the plan in terms of cost, customer service, operations,
and human resources.
12. Develop a chase aggregate plan for Draper using a permanent
workforce of 12 employees supplemented by overtime. All
demand must be met each period.
(a) Show what would happen if this plan were implemented.
(b) Calculate the costs associated with this plan.
(c) Evaluate the plan in terms of cost, customer service, operations,
and human resources.

BUS 515 Week 10 Problems Chapter 14 & 15
Chapter 14 Problems
18. Using the planned orders generated in Problem 17, complete
inventory records for components AB501, AB511, and
AB521. Use the lot size rule, lead time, and usage information
given in Problem 12.
20. The Yankee Machine Shop currently has three machines
working in Work Center 111, eight hours per day, five days per
week, a utilization rate of 90 percent, and an efficiency rate of
90 pecent.
(a) Calculate the available capacity.
(b) Is the available capacity enough to complete the orders
given in Problem 19 that are already scheduled in Work
Center 111? If not, how much additional capacity is
needed?
22. Unfortunately, after extending the work day from eight
hours to ten hours, the Yankee Machine Shop has noted that efficiency
has decreased to 80 percent. Given this new piece of information,
is there enough capacity to complete the orders given in
Problem 19?
24. In an effort to increase capacity in Work Center 111 for
week 13, Yankee Machine Shop has authorized overtime. The
work center will be staffed 12 hours per day for six days. Because
of the additional stress on the three machines, it is expected that
the utilization rate will drop to 85 percent. The efficiency rate is
expected to fall to 80 percent.
(a) Calculate the capacity available in Work Center 111 for
week 13.
(b) Will this plan provide sufficient capacity to complete the
orders given in Problem 23? If not, what do you recommend
be done?

Chapter 15 Problems
16. Barb’s Beach Bar operates seven days per week. Barb uses
only full-time employees and wants each employee to have two
consecutive days off each week. She believes that she needs a
minimum of three employees on Monday, Tuesday, Wednesday,
Thursday, and Sunday. On Friday and Saturday, she believes that
she needs six employees. Develop a workforce schedule for Barb.
18. Marvin’s Beach Cleaners is responsible for keeping the
beach clean. Marvin estimates that he needs a minimum of two
people on Monday; three people on Tuesday and Sunday; four
people on Wednesday and Thursday; and five people on Friday
and Saturday. Contractually, Marvin is required to give each employee
two consecutive days off during the week. Develop a
workforce schedule for Marvin to use.
20. Cathy’s Coney Islands operates seven days per week. Demand
is relatively constant during the week and tails off on the
weekend. She estimates that she needs five employees Monday
through Friday, and two employees on Saturday and Sunday. She
is committed to giving each employee two consecutive days off
during the week. Develop a workforce schedule for Cathy.
22. Bill’s Bar & Grill is open seven nights a week. Business is
busiest on Thursday, when there is a concert in the park across
the street. Bill wants a workforce schedule that allows each employee
two consecutive days off each week. He believes that he
needs four employees every day except on Thursday, when he believes
he needs six employees. Develop a workforce schedule for
Bill.

BUS 515 Week 1 – 10 Discussion Questions – Strayer University New

BUS/515 Discussion Questions Solved Week 1-10 – A Graded
Click on the BLUE link (hwmojo.com) below to purchase Solutions

http://www.hwmojo.com/products/bus515-discussions

We have all assignments and exams for BUS 515 and other classes. Visit www.hwmojo.com or email us support@hwmojo.com

BUS 515 Discussion Questions with Answers (To be use as guide)

BUS 515 Discussions

Week #1-1
Compare and contrast an existing organization’s three major functions (i.e., finance, marketing, and operations), and then justify the interdependence that operations have to finance and marketing. Provide examples to support your rationale.
The major functions of Verizon Wireless are key to their success. The finance area of Verizon ensures that good decisions are made in regards to the products and services that are offered to their customer where the marketing comes in and ensure that the customers are aware of the many products and services that are offered by the company and coming up with ideas that will captivate the customers. All the while operations is there to ensure that all the links of the business work hand in hand.

Week #1-2
Evaluate three historical developments in OM, focusing on one major movement in history. Next, assess the significance that each of the three selected developments had during the corresponding time period.

Week # 2-1
Analyze one existing business operations strategy, and then evaluate how well or how poorly the chosen strategy supports that business’ vision, mission, and business plan. Provide support for your rationale.
Suggest the competitive priorities that the existing business that you chose used in the development of its operations strategy. Provide specific examples to support your suggestion.

Week #2-2
Using product screening, analyze a new product from operations, marketing, and finance perspectives. Predict whether or not the product is likely to be successful, based on your analysis.
Analyze an existing product, and discuss two to four OM strategy changes that occurred during the product’s life cycle. Provide examples to support your analysis.

Week #3-1
Analyze the supply chain of an existing service or manufacturing organization, and justify two to three competitive advantages that the service or organization gains by utilizing the supply chain. Provide specific examples to support your rationale.
Select three problems that brick-and-mortar organizations face as they transition toward becoming virtual organizations. Debate whether the operations of virtual organizations exacerbate brick-and-mortar organizations’ existing problems or whether they create new problems. Provide specific examples to support your rationale.

Week #3-2
From the e-Activity, evaluate the pros and cons of an existing organization’s business strategy, and identify three supply chain performance metrics that align with customers’ expectations. Provide specific examples to support your rationale.
Evaluate the likelihood of success in an organization with poor supply chain performance metrics. Then, determine three supply chain performance metrics that were, in your opinion, misaligned with the customers’ expectations. Provide specific examples to support your rationale.

Week #4-1
From the first e-Activity, select three of Deming’s 14 points, and evaluate how each point is critical to the success of a TQM program. Provide specific examples to support your rationale.
Select three specific concepts from the philosophy of TQM, and present three situations in which organizations can identify quality problems and correct them at the source. Provide specific examples to support your rationale

Week #4-2
From the second e-Activity, select an organization that received the Malcolm Baldrige National Quality Award, and assess two to four contributions to quality that the chosen organization displayed. Compare the success of the chosen organization with organizations within similar industries, and judge whether TQM did or did not correlate with success.
Develop five strategies to share with an organization that would improve its quality standards. Provide specific examples to support your rationale.

Week #5-1
Develop three examples that illustrate how a manufacturing company of your choice uses JIT, and then determine three to four benefits of JIT for that particular organization. Provide specific examples to support your rationale.
Develop three examples that illustrate how a servicing company of your choice uses JIT, and then determine three to four benefits of JIT for that particular organization. Provide specific examples to support your rationale.

Week #5-2
Defend the benefits of the Delphi Method, and suggest two to three situations in which your past or current employer should have used it. Provide specific examples to support your rationale.
Compare and contrast the primary differences between a time-series model and a casual model. Debate two advantages and two disadvantages of each model. Provide specific examples to support your rationale

Week #6-1
From the e-Activity, analyze two to three different types of control charts, focusing on which aspects of each control chart would fit well in the industry that you chose to research.
Reconstruct a situation where a process was deemed out of control. Focus your reconstruction on key variations related to assignable causes or Type I errors. Next, determine the steps you could take to ensure that the process is maintained in the UCL, CL, or LCL of the control chart.

Week #6-2
Using the Six Sigma Approach (DMAIC), provide an example situation that utilizes the five-step plan, and determine three to four challenges you may encounter using this approach. Provide specific examples to support your rationale.
Using acceptance sampling, propose a situation in which you would be forced to utilize both the consumer’s risk and the producer’s risk, and then justify key usages of both within an industry of your choice. Provide specific examples to support your rationale

Week #7-1
Analyze two or three differences between design capacity and effective capacity, and then predict one or two challenges that you may encounter when using each method. Provide specific examples to support your rationale.
Using the three-step process found in the textbook, formulate a situation in which you must make a capacity planning decision. Provide three positive and three negative events that may occur during the process in question

Week # 7-2
Using the three steps found in the textbook for designing process layouts, critique a poor layout plan in your area and analyze two to three challenges you observed in the use of the poor layout plan. Then, develop a comprehensive plan to mitigate each challenge that you identified.
Determine key layout variables that you consider to be particularly important at your current or past employment location, and then describe three advantages and three disadvantages evident in the layout you observed.

Week #8-1
Describe one of the worst jobs you believe you have encountered, and speculate on why people are still attracted to this job. Create a redesign plan for this job which focuses on improved productivity.
Evaluate a compensation system of your choice in terms of how the compensation reinforces the behaviors needed to meet the company’s objective. Next, propose three improvements to the compensation system based on your evaluation

Week# 8-2
Using the four steps in network planning techniques, select a personal project that you have recently completed or are in the process of completing. Determine three to five challenges that could affect the estimated completion time.
Defend the determination of crashing a non-critical activity in your personal project network. Provide specific examples to support your rationale.

Week #9-1
Analyze the purpose of inventory management as it applies to operations management, and then evaluate the advantages and disadvantages evident in the use of the ABC classification system.
Suggest a situation in which safety stock must be utilized, and then determine how the organization should decide on the reorder point when using this methodology.

Week #9-2
Illustrate, using one example, a situation that utilizes aggregate planning, and then determine which level (chase or hybrid) should be used by the organization in the situation you have illustrated. Provide specific examples to support your rationale.
Compare and contrast two or three aggregate plans for companies with tangible products against aggregate plans for companies with nontangible products. Provide specific examples to support your rationale.

Week #10-1
From the e-Activity, analyze three to four benefits of the ERP, and then select an ERP vendor. Determine two or three factors that contributed to the selected vendor having improved productivity.
Compare and contrast independent and dependent demand, and then provide three to four advantages and disadvantages that are evident in both. Provide specific examples to support your rationale

Week # 10-2
Using the priority rules steps, propose a situation where you must utilize priority rules. Determine the effectiveness of priority rules in the situation you have selected. Provide specific examples to support your rationale.
Select an industry, and then discuss any bottleneck challenges you have witnessed in that specific industry. Suggest two to four methods in which those challenges can be mitigated by operations managers using the Optimized Production Technology (OPT) principles defined by Eli Goldratt.

BUS 515 Week 9 Assignment 3 – Strayer University New

BUS/515 Assignment 3: Vice President of Operations, Part 3
Click on the link below (hwmojo.com link in blue) to purchase Solutions

http://www.hwmojo.com/products/bus515-assignment-3

We have all assignments, homework problems and exams for BUS 515 and other Strayer classes. Email us support@hwmojo.com

BUS 515 Assignment 3: Vice President of Operations, Part 3
Due Week 9 and worth 320 points
Using the same scenario from Assignment 1, present the following findings to your Chief Executive Officer.
Create a presentation in a common format (PowerPoint or a similar program) with a minimum of twenty (20) slides and corresponding speaker notes in which you:
1. Determine which statistical technique you will employ to measure the quality characteristics of your organization. Provide examples to support the rationale.
2. Analyze the current facility location, and then use the three-step procedure to determine a new location.
3. Analyze the key concepts related to capacity planning and facility location for the new location.
4. Examine the current work system design, and determine your organization’s selected feasibility in the job design (i.e., technical, economic, behavioral). Assess key elements of the rationale in the work design competitive advantage.
5. Using the method analysis described in the textbook, defend the new change implementation process and the rationale for the change of method.
6. Develop a diagram showing network planning techniques, in which you use the program evaluation and review technique (PERT) and the critical path method (CPM).
7. Use at least three (3) quality academic resources in this assignment. Note: Wikipedia and other Websites do not quality as academic resources.
Your assignment must follow these formatting requirements:
• €Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
• €Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
• €Include corresponding speaker notes for each slide included in the presentation.

BUS 515 Week 5 Discussion Questions – Strayer University NEW

BUS/515 Week 5 Discussion Questions – Strayer NEW

Click On The Link Below to Purchase A+ Graded Material
Instant Download

http://www.hwgala.com/BUS-515-Week-5-Discussion-Questions-Strayer-NEW-BUS515W5D.htm

 

Week 5 DQ 1
“Just-in-Time (JIT)” Please respond to the following:
• Develop three examples that illustrate how a manufacturing company of your choice uses JIT, and then determine three to four benefits of JIT for that particular organization. Provide specific examples to support your rationale.
• Develop three examples that illustrate how a servicing company of your choice uses JIT, and then determine three to four benefits of JIT for that particular organization. Provide specific examples to support your rationale.

Week 5 DQ 2
“Forecasting” Please respond to the following:
• Defend the benefits of the Delphi Method, and suggest two to three situations in which your past or current employer should have used it. Provide specific examples to support your rationale.
• Compare and contrast the primary differences between a time-series model and a casual model. Debate two advantages and two disadvantages of each model. Provide specific examples to support your rationale.